Typical Steam Survey Report
|
AREA |
TAG |
APPL |
MODEL |
MFG |
PIPE SIZE |
DOP |
STEAM |
TEST |
LOSS |
COMMENTS |
LOCATION |
HRS/DAY |
DAYS |
STREAM LOSS |
COST |
|
BOILER ROOM |
101 |
SM |
TD52 |
SAR |
1 |
TD |
130 |
PLG/CK |
0 |
CHECK STRAINER |
BOILER - 350 HP |
12 |
260 |
0 |
0.00 |
|
BOILER ROOM |
101A |
HE |
TD52 |
SAR |
0.5 |
TD |
2 |
INST/ REMOVED |
0 |
BOILER-350 HP |
OIL-H.EXCH. |
0 |
0 |
0 |
0.00 |
|
BOILER ROOM |
102 |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
FO |
18 |
BOILER - 700 HP |
12 |
260 |
56160 |
280.80 |
|
|
BOILER ROOM |
102A |
HE |
800-20 |
ARM |
0.75 |
IB |
SL/RETEST |
PRV(2-30)1/2" USE N300-3/4" |
BOILER - 700 HP |
12 |
260 |
||||
|
BOILER/PILOT |
103 |
UH |
FT75 |
SAR |
1 |
FT |
50 |
OP |
0 |
|
PILOT DRYER RM |
12 |
260 |
0 |
0.00 |
|
BOILER/PILOT |
103A |
SM |
TD52 |
SAR |
0.5 |
TD |
50 |
OP |
0 |
S.W. BELOW SINK |
12 |
260 |
|||
|
REC TANK RM 1-2 |
146 |
UH |
FT125 |
NICH |
0.75 |
FT |
45 |
NIS |
0 |
RETEST |
NE CRNR BAY 1 |
12 |
260 |
0 |
0.00 |
|
TANK RM 1-2 |
143 |
UH |
FT75 |
SAR |
0.75 |
FT |
45 |
OOS |
0 |
UH REMOVED |
NW CRNR BAY 2 |
12 |
260 |
0 |
0.00 |
|
REC TANK RM 3-4 |
140 |
SM |
TD52 |
SAR |
0.75 |
TD |
45 |
FO/RP |
12 |
TRAP SHUT OFF |
WASH KETTLE B&C |
12 |
260 |
37440 |
187.20 |
|
REC TANK RM 3-4 |
141 |
SM |
FT125 |
SAR |
0.75 |
FT |
45 |
FO |
12 |
BAY 3 NE |
12 |
260 |
37440 |
187.20 |
|
|
REC TANK RM 3-4 |
142 |
UH |
FT75 |
SAR |
0.75 |
FT |
45 |
OP |
0 |
BAY 3 E. WALL |
12 |
260 |
0 |
0.00 |
|
|
REC TANK RM 3 |
144 |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
LEAK |
9 |
|
SE CORNER BAY 3 |
12 |
260 |
28080 |
140.40 |
|
CIPE- E |
136 |
HE |
FT125 |
SAR |
1.5 |
FT |
|
FC/RP |
0 |
TRAP FAILED CLOSED CHECK CK. VALVE |
CIPE "E" |
12 |
260 |
0 |
0.00 |
|
CIPE-E |
135 |
SM |
TD52 |
SAR |
0.5 |
TD |
130 |
OP |
0 |
DRIP AT PRV |
CIPE "E" |
12 |
260 |
0 |
0.00 |
|
6 PACK |
145 |
UH |
FT15 |
SAR |
0.75 |
FT |
12 |
OP |
0 |
UNIT HEATER |
12 |
260 |
0 |
0.00 |
|
|
OUT 10-11 |
114 |
SM |
TD52 |
SAR |
1 |
TD |
130 |
HEAVY LEAK |
15 |
LOWER SM TO PRV STATION |
12 |
260 |
46800 |
234.00 |
|
|
OUT 10-11 |
115 |
SM |
TD52 |
SAR |
1 |
TD |
130 |
LEAK |
15 |
WEST WALL |
UPPER SM |
12 |
260 |
46800 |
234.00 |
|
EVAP 1 |
117 |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
FO |
18 |
RETRAP @ 2ND LVL |
1ST FLR. LOWER LEVEL -E. WALL |
12 |
260 |
56160 |
280.80 |
|
EVAP 1 |
118 |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
NIS |
0 |
AT PRV STN |
N. WALL 2ND LVL |
12 |
260 |
0 |
0.00 |
|
EVAP 1 |
119 |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
OP |
0 |
S.WALL 3RD LVL |
12 |
260 |
0 |
0.00 |
|
|
EVAP 1 |
120 |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
OP |
0 |
S. CORNER 3 LVL |
12 |
260 |
0 |
0.00 |
|
|
EVAP 1 |
120A |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
INST/FC |
0 |
INSTALL DIRT LEG |
12 |
260 |
0 |
0.00 |
|
|
CREAM TANKS |
130 |
SM |
TD52 |
SAR |
0.75 |
TD |
130 |
LEAK |
9 |
TANK ROOM |
2ND LVL - PROCESS CONV #2 |
12 |
260 |
28080 |
140.40 |
|
TOTAL TRAPS SURVEYED |
23 |
336960 |
$1,684.80 |